Fusion® User Manual 8Oasis® User Manual 8
Installation: Start Up
Plug Case In/Turn On Main Power Switch:
Do not use an extension cord with this case.
Do not operate this equipment with a damaged cord,
plug, or outlet.
Ensure that the main power switch is off. (Note that the
FSI660, FSI860, FSE660, and FSC660 have two power
switches.)
Plug the cord into a certied 240V electrical outlet with
ground.
Turn the main power switch/switches on.
Coil fans should turn on.
From inside of the case, check for discharge air from
front, side, and end honeycomb, (if applicable), to
conrm that the fans are functioning properly.
When the case is in a start-up mode or has been idle for
a long period of time, the case may require 75 minutes
running time to pull down the temperature.
Turn lights on.
Light switch is located on the ceiling of merchandising
area.
The lights should come on at the same time.
Always maintain front and rear airow clearance of four
inches.
Obstruction or restriction of air can void warranty.
Note: Case temperature setting is determined by case
size. Temperature is controlled by a thermostat.
Light Switch
Main Power Switch
Drain Tubes
Check All Drain Connections:
A series of drain tubes connect the tub to multiple
condensate pans.
Ensure all drain tubes are connected and sealed.
Loose drain tubes can cause water to leak. If leak is
detected check all drain tube connections.

Bekijk gratis de handleiding van Structural Concepts Oasis FSI660R, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkStructural Concepts
ModelOasis FSI660R
CategorieNiet gecategoriseerd
TaalNederlands
Grootte5638 MB