Structural Concepts HMO2653R handleiding

43 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 3 van 43
3
SHIPMENT CONDITION / DAMAGE DISCOVERED DURING DELIVERY or UNCRATING / SHORTAGES
1. Shipment Condition
 Before and during unloading, check all equipment for damage.
2. Damage Discovered During Delivery
 3rd Party Carrier: Describe damage on freight bill and obtain signature of
driver. Carrier will supply necessary claim forms. If these steps are not
taken, carrier may refuse your claim.
 Prepaid and Add: Contact carrier (and follow same procedure as with
3rd party carrier). Also contact Structural Concepts at 1-800-433-9489.
3. Risk of Damage When Case is NOT Uncrated at Installation Site
 Uncrating equipment at a facility OTHER THAN the installation site may
result in SEVERE DAMAGE to unit when transporting to final
destination.
 Structural Concepts strongly recommends that equipment ONLY be
uncrated at installation site.
4. Damage Discovered After Uncrating
 3rd Party Carrier: Contact carrier within 10 days of delivery for their
procedures; retain all packaging. If these steps are not taken, carrier
may refuse your claim.
 Prepaid and Add: Contact carrier (and follow same procedure as with
3rd party carrier). Also contact Structural Concepts at 1-800-433-9489
within 10 days of delivery.
5. Shortages
 If a shortage exists (and it is the responsibility of Structural Concepts)
call 1-800-433-9489. Structural Concepts will acknowledge shortages
within 10 days from receipt of equipment.
 If a shortage involves the carrier, notify carrier immediately and request
an inspection.

Bekijk gratis de handleiding van Structural Concepts HMO2653R, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkStructural Concepts
ModelHMO2653R
CategorieKoelkast
TaalNederlands
Grootte14152 MB