Structural Concepts Fusion GMDSV4D handleiding
Handleiding
Je bekijkt pagina 11 van 35

11
INSTALLATION, CONT’D: REFRIGERATION LINES / STUB-UPS / DRAINS
9. Refrigration Line Stub-Up Connections
• Refrigerant stub-up access is at underside of
case.
• Stub-up connections are accessed by removing
rear panel (no screws required).
• Run case-to-case connections through cutouts in
base.
• Sweat the high and low pressure connections.
• Fill access hole with suitable filler to insure
watertight integrity of tub.
• Note: Illustration below may not reflect every
feature or option of your particular case.
10. Drains
• Cases have drains at left and right hand sides.
• Longer cases may have drain at case center.
• Drain field connection location as shown.
• See next page for illustration of TXV Valve,
Drains, Refrigeration Line Stub-Ups Access, etc.
• Depending upon drain access needs, either front
or rear panel may be removed to gain access to
drain stub-up.
• 1.5” male PVC stub-up connection is under case.
• Drain stub-up may be at case center in extended
length cases.
• Connect tub drain to floor drain. Maintain
1/4”-fall per foot to provide proper drainage.
Refrigeration
Line Stub-Ups
Access
Field Connection
for Drain
Model GMDS8R is Shown
Above. Your Case May Differ.
P-Trap
Model GMDSX4R isShown Above.
Field Connection
for Drain
Refrigeration
Line Stub-Ups
Access
Note: Illustrations shown may not
exactly reflect every feature or
option of your particular unit.
Bekijk gratis de handleiding van Structural Concepts Fusion GMDSV4D, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Structural Concepts |
Model | Fusion GMDSV4D |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 10553 MB |