Structural Concepts Fusion GLDSV6R handleiding

37 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 9 van 37
INSTALLATION, CONT’D: FRONT GLASS, UPRIGHT & TOP BOARD ADJUSTING - GLDS & GLDSV ONLY
9
8. Front Glass / Upright / Top Board Adjusting - Applicable To Models GLDS & GLDSV Only
>> Important: You must adjust BOTH LH & RH hex head
bolts (though ONLY LH bolt adjustment is shown below).
>> Note: Bolt adjustment may be necessary to properly
align front glass, upright & top board (as well as align
case with others in lineup).
A. View of Model GLDSV3R. Your model may differ.
B. Remove decking. Store safely away from foot traffic.
C. Remove rear perforated panel. Store safely away from
foot traffic.
D. Enlarged LH area of case after disassembly (left angle).
E. Enlarged LH area of case after disassembly (right angle).
F. Enlarged view of hex head bolt and weld nut.
Adjustment/Leveling Instructions:
>> Use 1/2ā€ wrench to adjust hex head bolts (BOTH LEFT
AND RIGHT though only left bolt is shown in illustrations).
>> Turn bolts clockwise to LOWER components.
>> Turn bolts counter-clockwise to RAISE components.
>> After front glass, upright and top board are adjusted
(and/or case is aligned with others in lineup), return panel,
decks, etc. to case in reverse order they were removed.
A
B
C
F
D
E
Upper
Discharge
LH Upright
Metal Pivot Arm
LH Hex Bolt /
Nut Weld

Bekijk gratis de handleiding van Structural Concepts Fusion GLDSV6R, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkStructural Concepts
ModelFusion GLDSV6R
CategorieNiet gecategoriseerd
TaalNederlands
Grootte11903 MB