Structural Concepts Fusion GLDSV6R handleiding

37 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 13 van 37
13
START-UP AND OPERATION
Start-Up And Operation
Unit will energize when properly field wired.
Evaporator coil fans will automatically turn on.
From the front of the case, lift glass and remove
the decking; check to see that the coil fans are all
functioning properly.
Lights switch is accessible at case front-left, near
upright. See illustration below.
Turn light switch on. All lights should come on at
the same time. First time lighting may require a
short warm up-period for the bulbs.
Slightly dim or a flickering of new bulbs is normal.
Digital Thermometer (Shown)
If lights do not turn on, check all raceway
plugs. The lighting is wired in series so all
lights must be plugged in or receptacles
capped in order for the case to light.
Refrigeration section has been tested to
maintain temperature at or below 5 °Celsius /
41 °Fahrenheit.
Note: Thermometers provided with equipment
reflect internal air temperature only (not actual
food temperature). Use probe thermometers to
determine actual product temperatures.
41°F
Light
Switch
or
Spirit-Filled
Thermometer
Note: Model GMDSV6R.7115C (model
shown) may not reflect every feature or
option of your particular unit.
--- Case Front ---
--- Case Rear ---

Bekijk gratis de handleiding van Structural Concepts Fusion GLDSV6R, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkStructural Concepts
ModelFusion GLDSV6R
CategorieNiet gecategoriseerd
TaalNederlands
Grootte11903 MB