Structural Concepts Fusion GLDSV4R handleiding
Handleiding
Je bekijkt pagina 23 van 37

23
CLEANING SCHEDULE - INTERIOR: TO BE PERFORMED BY STORE PERSONNEL
AREA FREQ. INSTRUCTIONS
Interior Daily Decks: Wipe off decks with moist cloth dipped in mild soap and water solution.
Weekly Extended Manual Defrost (For Units With Misting System Only):
Units with misting system can have ice buildup occur (causing case to operate
outside acceptable temperatures). Such models include GMDSV8R.7063B and
GMDSV12R.7063D. However, misting systems may also be on other models.
To prevent ice buildup, case must be placed in extended manual defrost until
all ice that may have built up in evaporator coils has thawed. This procedure
may take several hours.
If uncertain of proper extended manual defrost procedure, see your controller’s
instruction guide OR contact your facility’s maintenance/service manager.
Monthly Tub and Drain (Trained Service Providers Only):
Caution! Turn off power to unit before proceeding.
Area at underside of decking must be kept free of debris which could clog tub
and drain. To access drain area, remove the deck and fan shroud.
Use spray bottle and brush to dislodge residue. Use wet-vac on tub, trough
and drain to remove residue.
Caution! Avoid splattering water over the case and surrounding areas!
Monthly Condensing Coil:
Remove grille (by lifting up and off).
Use air pressure or industrial strength vacuum; clean dust and dirt that may
collect on the condenser coil.
Caution! Coil fins are sharp. Handle with care!
Replace rear grille. No screw attachment is necessary.
Bekijk gratis de handleiding van Structural Concepts Fusion GLDSV4R, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Structural Concepts |
Model | Fusion GLDSV4R |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 11903 MB |