Structural Concepts Fusion GJDSS8RLB handleiding

25 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 7 van 25
7
INSTALLATION: FIELD SERVICE CONNECTION SPACE REQUIREMENTS
4. Field Service Connection Requirements - Follow These Instructions
Note: Any Changes To This Document
Must Also Be Made To SCC Field
Service Connection Guide P/N 20-68334.
PURPOSE OF THESE INSTRUCTIONS: FOLLOWING THESE
INSTRUCTIONS WILL ENABLE THIS CASE TO BE MOVED
FORWARD FOR SERVICING FANS OR OTHER COMPONENTS
IN THE REAR (LARGER) CASE.
BRAZING: KEEP CASE 2-FOOT AWAY FROM REAR (LARGER)
CASE WHILE BRAZING REFRIGERATION LINES.
PVC DRAIN TUBE ATTACHMENT: SLIDE CASE BACK
AGAINST REAR (LARGER) CASE. THEN, CONNECT PVC
DRAIN TUBE TO COUPLER.
ELECTRICAL: ALLOW 2-FOOT SLACK IN WIRING.
Important!
Keep 2-Foot
Space From
Case Rear
(Larger Case)
While Brazing!
Coupler
PVC Drain Tube (To Be
Attached To Coupler)
Refrigeration Lines

Bekijk gratis de handleiding van Structural Concepts Fusion GJDSS8RLB, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkStructural Concepts
ModelFusion GJDSS8RLB
CategorieNiet gecategoriseerd
TaalNederlands
Grootte7913 MB