Structural Concepts Fusion GHPF652LB handleiding

13 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 5 van 13
5
INSTALLATION, CONTD: BOLTING UNITS TOGETHER / ELEC. RATINGS / FIELD ACCESS BOX
4. Bolting Units Together (Not All Cases)
Bolt units together at lower base as indicated.
Remove front and rear panels (no screw removal
required) to drill clearance hole through end panel
and into unit it is being attached to.
End panel is shown transparent for illustrative
purposes.
Use SCC-supplied screws for adjoinment.
5. Electrical Ratings
See SERIAL LABEL LOCATION &
INFORMATION LISTED / TECH INFO &
SERVICE section in this manual for instructions on
attaining electrical information for your case.
--- Model GHPF356LB ---
--- Model GHPF356LB ---
Field Access / Electrical Box
Model GHPF456LB.5882 Shown / Model GHPF456LB
Has Field Access Box In Same Location
Field Access Box
Ballast Box
6. Field Access Box / Ballast Box / 4 x 4 Box
Field access box with ballasts (for LED lights)
may be either at rear or at underside of unit (as
shown in illustrations below).
--- Model GHPF456LB.6165 ---
Field Access Box
Ballast Box

Bekijk gratis de handleiding van Structural Concepts Fusion GHPF652LB, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkStructural Concepts
ModelFusion GHPF652LB
CategorieNiet gecategoriseerd
TaalNederlands
Grootte8380 MB