Soler & Palau UTBS PRO-REG ECOWATT handleiding
Handleiding
Je bekijkt pagina 63 van 96

63
17.2. TCP/IP BACNET
PRO-REG controller is equipped with an integrated RJ45 port
for TCP/IP communication, as support for BACnet IP commu-
nication. It’s necessary to confi gure the IP address on each
controller, and activate and address the BACnet IP using
ETOOL software (E tool© is delivered as a self-installing pro-
gram and can be downloaded from
http://www.regincontrols.com/Root/Documentations/
42_105786/CorrigoEVentilation%203.4-1-24.zip)
It is necessary to indicate the names, IP fi xed directions, sub-
net masks and default gateway of each unit connected to the same network.
18. REPLACEMENT OF THE BATTERY FROM THE CORRIGO PROGRAMMABLE
LOGIC CONTROLLER
When the “battery low” alarm appears and the red indicator light is lit, it means that the
backup battery to save the memory and the real time clock is too low.
The procedure to change the battery is described below.
A capacitor allows backing up the memory and running the clock for approximately 10
minutes after the power is switched off.
TCP/IP
45 U I 4
44 U I 3
43 A g n d
42 U I 2
41 U I 1
40 A g n d
35 A I4
34 A I3
33 A g n d
Bekijk gratis de handleiding van Soler & Palau UTBS PRO-REG ECOWATT, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Soler & Palau |
| Model | UTBS PRO-REG ECOWATT |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 10463 MB |
