SolaX Power T-BAT HS5.0 handleiding

57 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 48 van 57
41
7 Commissioning
7.2 Start and Shutdown Procedure
Before commissioning, please check to ensure that, the installed battery modules
are the same model, and all the grounding cables, power cables, communication
cables, and heater cable are connected.
Power on
Step 1. Rotate the SWITCH to ON;
Step 2. Press the POWER button for more than 0.5 seconds to start system. See
figure below.
OFF
ON
OFF
ON
1 2
Rotate SWITCH
Press POWER
button
*Note:
Frequently pressing the POWER button may cause a system error.
If the system does not start after pressing POWER button, please try again in
at least 10 seconds.
Power off
Step 1. Rotate the SWITCH to OFF;
Step 2. Press the POWER button for 1 second to shut down system. See figure
below.
1 2
Rotate
SWITCH
Press POWER
button
OFF
ON
OFF
ON

Bekijk gratis de handleiding van SolaX Power T-BAT HS5.0, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkSolaX Power
ModelT-BAT HS5.0
CategorieNiet gecategoriseerd
TaalNederlands
Grootte4300 MB