39
7 Commissioning
7.2 Start and Shutdown Procedure
Before commissioning, please check to ensure that, the installed battery modules
are the same model, and all the grounding cables, power cables, communication
cables, and heater cable are connected.
Power on
Step 1. Rotate the SWITCH DISCONNECTOR to ON;
Step 2. Press the POWER button for more than 0.5 seconds to start system. See
figure below.
1 2
Rotate SWITCH
DISCONNECTOR
Press POWER
button
OFF
ON
SWITCH
DISCONNECTOR
OFF
ON
SWITCH
DISCONNECTOR
SWITCH
DISCONNECTOR
*Note:
Frequently pressing the POWER button may cause a system error.
If the system does not start after pressing POWER button, please try again in
at least 10 seconds.
Power off
Step 1. Rotate the SWITCH DISCONNECTOR to OFF;
Step 2. Press the POWER button for 1 second to shut down system. See figure
below.
1 2
Rotate SWITCH
DISCONNECTOR
SWITCH
DISCONNECTOR
OFF
ON
OFF
ON
SWITCH
DISCONNECTOR
SWITCH
DISCONNECTOR

Bekijk gratis de handleiding van SolaX Power T-BAT HS21.6, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkSolaX Power
ModelT-BAT HS21.6
CategorieNiet gecategoriseerd
TaalNederlands
Grootte4145 MB