SolaX Power T-BAT HS18.0 handleiding
Handleiding
Je bekijkt pagina 26 van 54

20
4 Preparation before Installation
4.4 Preparation
4.4.1 Check for Transport Damage
Ensure that the battery is intact during and after transportation. If there are
damages, such as cracks, please contact your dealer immediately.
4.4.2 Unpacking
Remove the packing tape on the carton to open the battery package. Ensure
that the battery modules and relevant items are complete. Check packing
lists carefully according to the detailed packaging items in the section “4.4.3
Accessories“. If any accessory is missing, please immediately contact our
company or your distributor.
CAUTION!
According to regional regulations, several people may be required for
moving the equipment.
WARNING!
Strictly follow the installation steps. Our company will not be responsible
for any injury or loss incurred by incorrect assembly and improper
operation.
NOTE!
When installing the battery for the first time, the manufacturing date
among battery modules should not exceed 3 months.
Bekijk gratis de handleiding van SolaX Power T-BAT HS18.0, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | SolaX Power |
| Model | T-BAT HS18.0 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 4145 MB |







