SolaX Power T-BAT HS15.0 handleiding
Handleiding
Je bekijkt pagina 46 van 57

39
7 Commissioning
Right side of BMS
White
lock
button
Power cable (black)
Grounding cable
Rotation wrench
Communication cable
Power
cable (red)
Here is the
white lock
button
Regarding the white lock
button, see the figure below.
Here is the
white lock
button
White
lock
button
*Note:
1. Press and hold the white lock button while unplugging the power cable, or it
cannot be pulled out.
2. Use the rotation wrench to tighten the communication cable, and remove it
after tightening.
3. After finishing wiring, correctly insert and tighten M4 screws to secure cover
plates on both the BMS and Series Box according to the
“Installation of Cover
Plate”
.
Bekijk gratis de handleiding van SolaX Power T-BAT HS15.0, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | SolaX Power |
| Model | T-BAT HS15.0 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 4300 MB |







