Handleiding
Je bekijkt pagina 15 van 173

English - 13
2. Handle
Use the handles when carrying and installing the cabinet.
Put the handles in their original positions after the installation work has been completed.
When carrying or installing the
cabinet, pull out the handles on
both sides.
Put the handles back after the
work has been completed.
3. Mark the positions of the anchor points on the wall
• Mark the positions of the holes you will make for the anchor points (refer to the gures below and the
“Anchor points number and positions” table on the next page).
• Before making the holes, check the verticality of the marks using a spirit level or a laser line level.
(We recommend using a laser line level is recommended for accuracy.)
Anchor points positions: 4 x 4 frame set
1026 mm
608 mm608 mm
Bekijk gratis de handleiding van Sharp LD-FE193, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Sharp |
| Model | LD-FE193 |
| Categorie | Monitor |
| Taal | Nederlands |
| Grootte | 29643 MB |







