Samsung AM100AXVFNH handleiding

62 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 11 van 62
11
English
Installation Procedure
Base ground construction
(Unit : mm)
<When installing on the ground>
Draining pit
Over 200
<When installing on the roof>
Bottom surface of the base ground
must be horizontally leveled
Over 200
Over 200
Outdoor unit installation
(Unit : mm)
Base
ground
H beam or anti-
vibration frame
Over
200
Over 200
Over 50
Outdoor unit base mount and anchor
bolt position
A
B
54
730
765
54
Outdoor unit - Anti-vibration
frame (4-Ø 12)
Anti-vibration - Base ground
(4-Ø 18)
(Unit : mm)
(Unit : mm)
Classification
(mm)
DVM S2 Small Type DVM S2 Large Type
W930 x H1695 x D765 W1295 x H1695 x D765
A 930 1295
B 790 1155
Refer to the blueprints in technical data book to make a holes
for connecting the anti-vibration pad.
Examples of draining work
Construct the drainage ditch with reinforced concretes and
make sure that water-proofing work is done.
For smooth draining of defrost water, make sure to apply 1/50
slope.
Construct a drainage around the outdoor unit to prevent
the defrost water (from the outdoor unit) from stagnating,
overflowing or freezing near the installation space.
When the outdoor unit is installed on the roof, check the
strength and waterproof status of the roof.
(Unit : mm)
960
730100
80
80
80
60°
120
X
X’
Direction of
the drainage
(Slope 1/50)
<Drainage work for single installation>
B
A
50
100
150 100
<X-X’ SECTION>
80
80
80
80
80
80
80
80
60°
60°
240
B B
240
Direction
of the
drainage
(Slope 1/50)
<Drainage work for module installation>
(Unit : mm)
Classification DVM S2 Small Type DVM S2 Large Type
A 1030 1395
B 790 1155
Outdoor unit installation

Bekijk gratis de handleiding van Samsung AM100AXVFNH, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkSamsung
ModelAM100AXVFNH
CategorieAirco
TaalNederlands
Grootte9280 MB