Samsung AM056DNMDKG handleiding

70 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 36 van 70
Installation Procedure
36
English
Installation manual
Centralized Drainage without the drain pump
1 Install horizontal drainpipe with a slope of 1/100 or more and fix it by hanger space of 1.0~1.5m.
2 Install U-trap at the end of the drainpipe to prevent a nasty smell to reach the indoor unit.
100mm or more
Ceiling
Horizontal drainpipe more than 1/100 slope
Centralized Drainage with the drain pump
1 Install horizontal drainpipe with a slope of 1/100 or more and fix it by hanger space of 1.0~1.5m.
2 Install U-trap at the end of the drainpipe to prevent a nasty smell to reach the indoor unit.
Hanger
Main drainpipe
Individual
air vent
Main air vent
Centralized horizontal drainpipe
(more than 1/100 slope)
550mm or
less
1~1.5m
Performing the drainage test
1 Pour water into the base pan in the indoor unit as shown
in figure.
CAUTION
The leak test must be performed for at least 24
hours.
2 Confirm that the water flows out through the drain hose.
a. Pour about 2 liters of water into the indoor unit
drain pan.

Bekijk gratis de handleiding van Samsung AM056DNMDKG, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkSamsung
ModelAM056DNMDKG
CategorieNiet gecategoriseerd
TaalNederlands
Grootte6315 MB