Installation Procedure
<Geological condition>
High humidity places such as shoreline, hot
spring, near lake or river, and ridge (when the
part of the building is covered by earth and sand.)
<Operation purpose condition>
Restaurant ceiling, sauna, swimming pool etc.
<Building construction condition>
The ceiling frequently exposed to moisture and
cooling is not covered.
e.g. The pipe installed at a corridor of a dormitory
and studio or near an exit that opens and closes
frequently.
The place where the pipe is installed is highly
humid due to the lack of ventilation system.
Step 11 Checking the earthing
If the power distribution circuit does not have a earthing
or the earthing does not comply with specifications, an
earthing electrode must be installed. The corresponding
accessories are not supplied with the air conditioner.
1 Select an earthing electrode that complies with the
specifications given in the illustration.
2 Connect the flexible hose to the flexible hose port.
• In damp hard soil rather than loose sandy or
gravel soil that has a higher earthing resistance.
• Away from underground structures or facilities,
such as gas pipes, water pipes, telephone lines
and underground cables.
• At least two metres away from a lightening
conductor earthing electrode and its cable.
NOTE
• The earthing wire for the telephone line cannot be
used to ground the air conditioner.
Carbon plastic
50 cm
PVC-insulated
green/yellow
wire
To grounding screw
Steel core
30 cm
Terminal M4
3 Finish wrapping insulating tape around the rest of
the pipes leading to the outdoor unit.
4 Install a green/yellow coloured earthing wire:
• If the earthing wire is too short, connect an
extension lead in a mechanical way and wrap it
with insulating tape (do not bury the connection).
• Secure the earthing wire in position with staples.
NOTE
• If the earthing electrode is installed in an area with
heavy traffic, its wire must be connected securely.
5 Carefully check the installation by measuring the
earthing resistance with a earth resistance tester. If
the resistance is above the required level, drive the
electrode deeper into the ground or increase the
number of earthing electrodes.
6 Connect the earthing wire to the electrical
component box inside of the outdoor unit.
Step 12 Performing final check and
trial operation
<Main PCB>
1 Check the power supply between the outdoor unit
and the auxiliary circuit breaker.
• 1 phase power supply: L, N
2 Check the indoor unit.
a Check that you have connected the power and
communication cables correctly. (If the power
cable and communication cables one mixed up or
connected incorrectly, the PCB will be damaged.)
b Check that the thermistor sensor, drain pump/
hose, and display are connected correctly.
3 Press K2 on the outdoor unit PCB to run the test mode
and stop.