Handleiding
Je bekijkt pagina 18 van 31

18
Installation Procedure
English
Installation Procedure
3 Connectthecharginghoseoflowpressureside
ofmanifoldgaugetothepackedvalvehavinga
serviceportasshownatthefigure.
CAUTION
• Thedesignsandshapearesubjecttochange
accordingtothemodel.
4 Openthevalveofthelowpressureside(A)of
manifoldgaugeanticlockwise.
Vacuum
pump
A(Gas)
B(liquid)
5 Purgetheairfromthesystemusingvacuumpump
forabout10minutes.
• Closethevalveofthelowpressuresideof
manifoldgaugeclockwise.
• Makesurethatpressuregaugeshows-0.1
MPa(-76cmHg)afterabout10minutes.This
procedureisveryimportanttoavoidagasleak.
• Turnoffthevacuumpump.
• Removethehoseofthelowpressuresideofmanifold
gauge.
6 Openthestopvalveofbothliquidandgassides.
7 Mountthevalvestemnutsandtheserviceport
captothevalve,andtightenthematthetorqueof
183kgfꞏcmwithatorquewrench.
8 Checkforgasleakage.
• Atthistime,especiallycheckforgasleakagefrom
the3-wayvalve’sstemnuts(Aport),andfromthe
serviceportcap.
CAUTION
• Connecttheindoorandoutdoorunitsusingpipes
withflaredconnections(notsupplied).Forthe
lines,useinsulated,unwelded,degreasedand
deoxidizedcopperpipe,(CuDHPtypetoISO1337or
UNIEN12735-1),suitableforoperatingpressures
ofatleast4200kPaandforaburstpressureofat
least20700kPa.Copperpipeforhydro-sanitary
applicationsiscompletelyunsuitable.
• Forsizingandlimits(heightdifference,line
length,max.bends,refrigerantcharge,etc.)see
“Connectingrefrigerantpipesection”.
Step 8 Performing the gas leak test
LEAK TEST WITH NITROGEN (before opening valves)
Inordertodetectbasicrefrigerantleaks,before
recreatingthevacuumandrecirculatingtheR-410A,
itistheresponsibilityoftheinstallertopressurize
thewholesystemwithnitrogen(usingacylinderwith
pressurereducer)atapressureabove0.2MPa,less
than4MPa(gauge).
LEAK TEST WITH R-410A (after opening valves)
Beforeopeningvalves,dischargeallthenitrogeninto
thesystemandcreatevacuum.Afteropeningvalves
checkleaksusingaleakdetectorforrefrigerantR-410A.
Onceyouhavecompletedalltheconnections,check
forpossibleleaksusingleakdetectorspecifically
designedforHFCrefrigerants.
A(Gas)
B(Liquid)
• Thedesignsandshapearesubjecttochange
accordingtothemodel.
Step 9 Connecting the drain hose to
the outdoor unit
Whenusingtheairconditionerintheheatingmode,
icemayaccumulate.Duringde-icing(defrost
operation),thecondensedwatermustbedrainedoff
safely.Consequently,youmustinstalladrainhoseon
theoutdoorunit,followingtheinstructionsbelow.
1 Makespacemorethan80mmbetweenthe
bottomoftheoutdoorunitandthegroundfor
installationofthedrainhose,asshowninfigure.
Bekijk gratis de handleiding van Samsung AC012TXQLEC, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Samsung |
Model | AC012TXQLEC |
Categorie | Airco |
Taal | Nederlands |
Grootte | 5260 MB |