Handleiding
Je bekijkt pagina 15 van 16

Rinnai 15 Split AC IM
FINAL CHECKLIST
IMPORTANT
The checklist is ONLY to be completed by an Authorised Person.
Check Item What can happen if not checked
Is the indoor unit installed securely? Falling, vibration, noise
Has an inspection been made to check for gas leakage? No cooling or heating
Has all thermal insulation been completed (vapour pipes,
liquid pipes, indoor portions of the drain hose extension)?
Condensation
Is the drainage secure? Water leakage
Are the electric wires installed correctly?
No cooling or heating, may cause electrical shock or
electrical re.
Is the wiring in accordance within the specications? Operation failure, electrical re
Are all inlets / outlets of the indoor and outdoor units free of
any obstructions?
No cooling or heating
Are the stop valves open? No cooling or heating
Are the pipes designed for use with R32? Pipe or pipe connection leakage
Has a leak test been carried out for the pipe connections? Pipe connection leakage
Has air purging been carried out? No cooling or heating
Has the appliance been tested for correct operation? No cooling or heating
Is the end user fully aware of the operating procedure? Incorrect operation
If you have answered no to any of the above, you must check and correct before appliance hand-over to customer.
INSTALLATION
Bekijk gratis de handleiding van Rinnai HSNCJ25B, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Rinnai |
Model | HSNCJ25B |
Categorie | Airco |
Taal | Nederlands |
Grootte | 2238 MB |