Prebena 1A-AZ25BNH handleiding

144 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 93 van 144
Preparing the tacker
23
Connect air hose
You can connect the tacker to a compressor or a compressed air
system.
Operation with a compressor or a compressed air system is
permissible only under the following conditions
The operating pressure of the compressor or the compressed air
system must not be more than 10% greater than the maximum
operating pressure, 8.3 bar, of the tacker.
For compressed air systems with higher pressure, a pressure
regulating valve (pressure reducer) with a pressure relief valve
connected downstream must be installed in the compressed air
line.
The compressed air must be filtered, dry, and oiled with
PREBENA special driver oil.
A compressed air preparation unit must be installed on the
coupling side at the outlets for the compressed air line to the
tacker. It must include
- a filter
- a water separator
- an oiler
If no oiler is installed, the length of the air line to the tacker must
not exceed 10 m. Otherwise, you must add three to five drops of
PREBENA special driver oil directly into the air inlet of the tacker
every day prior to starting operation.
The compressed air system must be able to maintain operating
pressure even when the desired amount of air is being used.
The inner diameter of the fixed air lines must be at least 19 mm.
The connector for the tacker must be equipped with a quick-
connect coupling with nominal diameter of 7.2 and at least 6.5
mm inner diameter.

Bekijk gratis de handleiding van Prebena 1A-AZ25BNH, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkPrebena
Model1A-AZ25BNH
CategorieNiet gecategoriseerd
TaalNederlands
Grootte12657 MB