2.2 - OPENING THE UNIT (Fig.3)
a. Delicatelyrotatetheairoutletaps90°.
b.Undothexingscrews(a)highlightedinthegure.
c.Makethefrontpaneltiltslightlyandthenliftittoreleaseitfromthehooks(b)highlightedinthegure.
d. Disconnect the command display-board connector.
2.3 - UNIT INSTALLATION
a. Usethetemplateinthepackaging(tobecutalongtheindicatedlines)andmarkonthewalltheposition
ofthetwoxingbrackets.
Refer to gure 4a for high wall installation.
Refer to gure 4b for low wall installation.
b. Drillusinganappropriatebitandinsertthedowels(T),2foreachbracket.
c. Securethetwobrackets(S)(g.5).Donottightenthescrewsexcessively,soastobeabletoadjustthe
bracketsusingabubblelevel(g.6).
d. Denitivelylockthetwobrackets(S)bytighteningthefourscrewscompletely.
e. Ensuretheirstabilitybymanuallymovingthebracketsrightwardsandleftwards,upanddown.
f. Mounttheunitcheckingcorrecthookingonthebracketsanditsstability(g.7).
g. Toconguredisplayvisualizationcorrectly,pleaserefertoparagraph“3.12.eDisplayrotation”.
2.4 - WATER CONNECTIONS
2.4.a - Pipelines diameter
Theminimuminternaldiameterwhichmustberespectedforthepipelinesofthewaterconnectionsvaries
dependingonthemodel:
SLW 400 -> ø14 mm I SLW 600 -> ø16 mm I SLW 800 -> ø18 mm
For the position of the pipelines and of the connections, please refer to the version you have
purchased (2-way or 3-way valve) and to the type of installation (high or low wall).
2.4.b - Connections
Thechoiceanddimensioningofthewaterlinesareresponsibilityofthedesignerwhomustoperatein
accordancewithgoodpracticeregulationsandlawsinforce.
Toperformtheconnections(g.8):
a. Position the water lines.
b. Tightentheconnectionsusingthemethod“wrenchagainstwrench”.
c. Checkforpossiblelossofliquid.
d. Coattheconnectionswithinsulatingmaterial.
The water lines and the junctions must be thermally insulated
Avoid partial insulations of the pipelines.
Avoid tightening excessively not to damage insulation.
Use hemp and green paste for water tightness of the threaded connections; the use of Teon
tape is advised in the presence of antifreeze liquid in the water circuit.

Bekijk gratis de handleiding van Olimpia Splendid Bi2 Wall TR, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkOlimpia Splendid
ModelBi2 Wall TR
CategorieNiet gecategoriseerd
TaalNederlands
Grootte30074 MB