Nibe ERS S40-350 handleiding

32 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 10 van 32
9. Install the humidity sensor (BM20) and the insulation
plug in the right-hand space.
There is a cable tie on the sensor, indicating how far in
the sensor has to be positioned.
10. Dismantle the grating.
11. Install the insulation plug and sensor (BT21) furthest in
the left-hand section.
12. Refit the grating.
13. Switch the filters around. Filter ePM1 55% must be
placed on the supply air side.
14. Fit the filter cassettes.
15. Mark the change to the air flows on the duct connection
plate (PZ4) on the upper side of the product.
Caution
In order to complete the conversion, changes are
required in menu 7.2.11.
NIBE ERS S40-400Chapter 2 | Delivery and handling10

Bekijk gratis de handleiding van Nibe ERS S40-350, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkNibe
ModelERS S40-350
CategorieNiet gecategoriseerd
TaalNederlands
Grootte4070 MB