Nevadent SMD 24 B2 handleiding

252 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 12 van 252
GB
IE
9 SMD 24 B2
Before first use
Requirements for the set-up location
To ensure safe and trouble-free operation of the appliance, the set-up location must fulfil
the following requirements:
The appliance may only be operated free-standing if used in dry rooms. The set-up
location must be a horizontal, level and stable surface.
In damp rooms, especially in the vicinity of water, the appliance must be firmly fixed to
the wall to protect it from falling into water.
The mains power socket must be easily accessible so that the power cable can be
quickly disconnected in an emergency.
Wall mounting
Note
Before mounting to the wall, make sure that there are no electric cables, wires or
pipes running behind the wall surface where you plan to hang the appliance.
1. Mark two drill holes on the wall 7.2cm apart and drill the marked holes with a 5mm
bit. Ensure that there is a power socket in the immediate vicinity.
2. Push the two supplied wall plugs
0 into the drilled holes and screw the two supplied
screws 9 into the wall plugs 0. Take care that the screws 9 still protrude about
3 mm out of the holes.

Bekijk gratis de handleiding van Nevadent SMD 24 B2, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkNevadent
ModelSMD 24 B2
CategorieNiet gecategoriseerd
TaalNederlands
Grootte15091 MB