MuxLab 500789 handleiding
Handleiding
Je bekijkt pagina 24 van 39

94-000954-C / SE-000954-C Page 24
2.6 Creating and Managing Schedules
A schedule can be configured for a particular Unit or a Unit Group.
Note:
If a unit belongs to a group, the schedule can only be configured on the group as a whole, and not on
an individual unit within a group.
As of this DigiSign Software release, each schedule created must be initially linked to a given Signage
Player, or to a Group of Signage Players.
2.6.1 Creating a Schedule for a Player and Publishing
To create a schedule for a Unit, please follow the below steps:
1. Click “Schedules” on the far left of the main page.
2. Select the “UNITS” tab near the top.
3. Select a given Unit by clicking on the icon on the far right.
Bekijk gratis de handleiding van MuxLab 500789, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | MuxLab |
| Model | 500789 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 7469 MB |







