Mission Air MAL-160 handleiding

44 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 22 van 44
Please read the instructions carefully to ensure safe and efficient installation. Remember that the final
electrical connections must be made by a qualified electrician and the warranty card must be
properly completed and signed by the electrician assembling the entire system to ensure warranty
protection.
The Mission Air® Heating System should only be installed by qualified personnel who are familiar
with the construction and operation of the product and take into account the risks of handling it
differently from those indicated in the instructions.
Mission Air Sp. z o.o. is not liable for damages resulting from non-compliance with the instructions.
INITIAL START-UP OF THE HEATING SYSTEM
After connecting the temperature controller, the entire system is practically ready for operation.
The system should be warmed up gradually over the next few days, starting from a temperature of
18°C.
If glue was used to lay the floor panels, the first start-up of the system should be postponed for
several days.
missionair
B I U R O @ M I S S I O N A I R . P L S E R W I S @ M I S S I O N A I R . P L W W W . M I S S I O N A I R . P LT E L . ( + 4 8 ) 7 9 7 4 5 1 1 1 1
M A L - 1 6 0 H E A T I N G M A T A S S E M B L Y M A N U A L
E N

Bekijk gratis de handleiding van Mission Air MAL-160, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkMission Air
ModelMAL-160
CategorieNiet gecategoriseerd
TaalNederlands
Grootte4923 MB