Miele DA 2247 handleiding

44 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 36 van 44
Installation
36
a
Exhaust duct 6"(150mm)
The duct is installed on the left-hand side at the factory.
If you want to install the duct at the front or rear, you can rotate the blower
casing by 90° during installation. To rotate the casing, there must be a
clearance of 4"(100mm) in the ceiling in front of and behind the ceiling cut-
out.
If you want to install the duct on the right-hand side, rotate the ventilation
hood by 180° during installation. To ensure that the panel still opens to the
front, you must convert the panel hinges.
b
Duct 6"(150mm), as air vent in Plug&Play mode or for the connection of an
air duct in ducted recirculation mode
The duct is installed on the left-hand side at the factory.
It is not possible to convert the duct to the front or rear.
If you want to install the duct on the right-hand side, rotate the ventilation
hood by 180° during installation. To ensure that the panel still opens to the
front, you must convert the panel hinges.
The required installation steps are described in the installation sheet.

Bekijk gratis de handleiding van Miele DA 2247, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkMiele
ModelDA 2247
CategorieAfzuigkap
TaalNederlands
Grootte4754 MB