Handleiding
Je bekijkt pagina 11 van 76

EN
11
Installing the water line
WARNING: Connect to potable water supply only.
Water line installation kits are available as an additional accessory from your dealer or at a local
hardware store.
Connecting to the water supply line
1. First, shut off the main water supply line and turn off the ice maker.
2. Locate the nearest cold water supply valve.
3. After connecting the water supply to the water valve, turn your main water supply back on and
flush several gallons of water to clear the water supply line.
The minimum inlet water pressure: 276kPa
The maximum inlet water pressure: 689kPa
Shut-off valve
Cold water line
Pipe clamp
Water line installation kit
Connecting the water line to the refrigerator
There are several items that you need to purchase to complete this connection. These items are
available in kits at your local hardware store.
1. Insert the water line (included) into the appropriate hole on water connector (included),
then insert the water line installation kit (not included) into another hole on water connector
(included).
2. Turn on the water valve and check for any leakage.
3. When moving the refrigerator, you can hang the power cord on the power cord hook.
Water connector
Water line
Power cord hook
Water line
Bekijk gratis de handleiding van Midea MRB23D5AST, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Midea |
Model | MRB23D5AST |
Categorie | Koelkast |
Taal | Nederlands |
Grootte | 6479 MB |