Handleiding
Je bekijkt pagina 44 van 58

44 M1179886
10. Opening Strength Adjustment (Metal C-cover) – As part of the AB-cover removal process, we will need
to remove the current C-cover steels which are located at the bottom front edge pockets and install new
provided steels.
a. C-cover Steels Mylar Removal – Take C-cover and remove mylars covering the closure steels using
tweezers.
b. C-cover Steels Removal – Using tweezers again, remove the closure steels located in the two regions at
the front edge of the C-cover.
c. Clean Closure Steel Area – Clean off the closure steel area thoroughly with a cotton swab and IPA. Be
sure there is no debris or residue left over.
d. Install New Closure Steels – Install new closure steels about 2mm from the outside edge of the C-cover
as shown in the image below using tweezers.
e. Left Closure Steel Placement – Place single closure steel into left enclosure pocket about 2mm from
the outside left edge of C-cover.
f. Secure Left Closure Steel – Using the back of the tweezers, press continuously and rmly along the
surface of the steel for 80 seconds.
g. Tape Left Closure Steel – Place mylar tape over the steel. Black tape should fully cover steel and
overlap onto the C-cover.
h. Smooth Left Closure Steel Tape – Use Spudger tool to smooth out and atten the tape to secure the
steel.
i. Right Closure Steel Placement – Place single closure steel into right enclosure pocket about 2mm
from the outside right edge of C-cover.
Bekijk gratis de handleiding van Microsoft Surface Laptop Go 3, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Microsoft |
| Model | Surface Laptop Go 3 |
| Categorie | Laptop |
| Taal | Nederlands |
| Grootte | 6078 MB |
Caratteristiche Prodotto
| Kleur van het product | Platina |
| Gewicht | 1130 g |
| Breedte | 278 mm |
| Diepte | 206 mm |
| Hoogte | 15.7 mm |