Handleiding
Je bekijkt pagina 12 van 26

First steps
When you rst receive your air conditioner, it is important you follow the steps below carefully:
1. Check your air conditioner and its box and packaging for any transport damage. In case of
damage, inform the sender immediately.
2. Leave the air conditioner to stand for 24 hours before turning it on. This will allow any refrigerant
that may have moved during transit to settle.
3. When using the air conditioner make sure it is placed on a level surface with at least 50 cm of free
space around it to allow for adequate air ow.
4. Do not operate the air conditioner near walls, curtains or other objects that may block the air outlet
or air inlet.
5. Keep the packaging for the air conditioner in a safe place in order to be able to dispatch the air
conditioner safely if it requires a service. In order to save space, you can simply cut through the
adhesive tape using a knife and fold the cardboard box.
Air Conditioner Principles
Cooling works best in a well-sealed room with as little heat gain from sunlight as possible. We advise
keeping all doors, windows and curtains/blinds closed before using the air conditioner in order to stop
the room getting hot in the rst place. This is especially useful in bedrooms where pre-cooling the
room before going to bed is more sensible than trying to sleep with an air conditioner turned on in
the room.
[EN] 9
Bekijk gratis de handleiding van Meaco Cool Pro Series 12000, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Meaco |
Model | Cool Pro Series 12000 |
Categorie | Airco |
Taal | Nederlands |
Grootte | 2446 MB |