MDT BE-TA55T2.G2 handleiding
Handleiding
Je bekijkt pagina 16 van 51

MDT technologies GmbH · Papiermühle 1 · 51766 Engelskirchen · Germany
Telephone: +49 (0) 2263 880 · knx@mdt.de · www.mdt-group.com
16 / 51
Technical Manual
Push Button 55 / Plus 55 / Plus TS 55 [BE-TA55xx(06).x2]
State 07/2025 - Version 1.3
4 ETS Parameter
4.1 General Settings
The following table shows the available settings:
ETS Text
Dynamic range
[Default value]
Comment
Startup time 2 … 240 s
[2 s]
Sets the time between restart and
functional start-up of the device.
Send „In operation“ cyclically not active
1 min – 24 h
Activation of a cyclical “In operation”
telegram.
Objects „Status for toggle“
after bus power return
■ do not request
■ request
Setting whether the objects “Status for
toggle” are to be automatically queried
on bus voltage recovery.
Table 6: General settings
Startup time
This time denes when the unit “boots up” after a restart (reset, reprogramming, bus voltage recovery).
This can be important if - example 1 - a bus reset is carried out. If there are many units on a line, all units
would start at the same time and load the bus. With a variable time, the units can thus start differently.
„In operation“
“In operation” is used to show on the bus that the unit is “alive”. If activated, an ON telegram is sent
cyclically.
The table shows the general communication objects:
No. Name / Object function Length Usage
* 42/66/90/114 In operation – Output 1 Bit Sending a cyclic “In operation” telegram
Table 7: General communication objects
* Numbers apply to devices with 2/4/6/8 buttons.
Bekijk gratis de handleiding van MDT BE-TA55T2.G2, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | MDT |
| Model | BE-TA55T2.G2 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 7557 MB |







