JANDY CD70 handleiding
Handleiding
Je bekijkt pagina 2 van 2

1
4 5
2
3
Mount the Generator
1. Unscrew two (2) screws to open the enclosure door.
2. Locate the three mounting holes in the back of the enclosure.
3. Align the drill guide against the mounting surface using a level. (The drill
guide for aligning the top two holes can be found on the edge of this Quick
Start Guide). Make pencil marks on the mounting surface through the paper
guide holes.
4. Install two (2) screws through the top mounting holes.
5. Install the third screw through the bottom mounting hole.
NOTE: Mounting hardware must be driven until the head fully contacts
the enclosure wall.
Prepare the Pool
Before installation and initial startup of the ozone generator:
1. Backwash or clean fi lters one day before.
2. Superchlorinate the pool water using a chlorine based shock treatment.
3. Test the pool water chemistry according to the guidelines in this
Quick Start Guide.
4. Run the pool fi lter continuously for 24 hours.
Connect to Power Source
IMPORTANT
Be sure to refer to the installation and operation manual and to the IMPORTANT
SAFETY INSTRUCTIONS contained therein, along with those contained on the
reverse side of this guide to avoid possibly serious electrical hazards.
1. Connect the ozone generator to the fi lter
pump relay.
2. Install conduit fi tting through one of the three
knockouts (one on the back, two on sides).
3. Locate the Terminal Block inside enclosure.
(Refer to wiring diagram on the label inside
the enclosure door)
4. For 120V, connect Line to L1, Neutral to
L2 and Ground to the terminal block as
indicated by the label on the inside of the enclosure door.
5. Using a 6 AWG (13.3 mm
2
) conductor, connect the grounding lug on the
bottom of the ozone generator to an appropriate earth contact.
Wiring
Information
Perform Ozone Flow Test
IMPORTANT
If pressure testing a new equipment system, perform the pressure
test prior to connecting the ozone gas line.
Install the 3/4” pipe cap provided onto the manifold injector
before performing the pressure test.
1. Install the tube adapter on the manifold injector. DO NOT
use Tefl on
®
thread tape.
2. Connect the longer ozone tubing (with check valve) onto
the tube adapter.
3. Connect the fl ow meter assembly tubing to the ozone
outlet barb at the bottom of the ozone generator.
4. Connect the ends of the ozone tube and the fl ow meter
assembly.
Ozone
Outlet Barb
Flow Meter Assembly
(Remove after testing)
Ozone Generator System
Ozone Tube
Check Valve
Tube Adapter
Injector Assembly
Heater
Filter
Ozone Generator
Injector
Manifold
Check
Valve
To Pool
Check Valve
(Required if equipment
is above water level)
From Pump
1
2
4
3
5. Hold the fl ow meter assembly tubing so that the clear
plastic chamber is vertical with the longer tubing toward
the bottom.
6. Turn on the pump.
7. Verify that the metal ball in the fl ow
meter assembly fl oats between the
Max and Min lines.
8. If ozone gas fl ow is too low, verify
that other valves in the system are
not inhibiting fl ow through the manifold.
9. Remove the fl ow meter assembly from the ozone outlet
barb and from the ozone tube.
10. Cut off any excess tubing so that the line from the injector
manifold to the ozone generator is straight and free from
dips and loops.
11. Connect the end of the ozone tube to the ozone outlet
barb. Ensure that all hose barb connections are secured
with hose clamps. Secure and route and slack tubing as
necessary, to minimize tripping or entanglement hazard.
Use this template to drill holes for mounting the power pack
←
Top Right
→
Top Left
Ozone Generator Mounting Template
Plumb Injector Manifold or Mixing Degas Vessel
IMPORTANT
A check valve must be installed immediately after the heater and before any device
which can introduce strong oxidizers or affect key measurable water parameters. Not
installing a check valve may void the warranty of your heater or heat pump.
The injector manifold is installed in the pool’s main return line after all other pool equipment
(pump, fi lter, heater, and cleaner). Refer to the Owner’s Manual for alternate confi gurations
for systems with the following components: Pool Cleaner, Salt Chlorinator, Chlorine Tab/
Mineral Erosion Feeder, In-Floor Cleaning System, Water Features.
As an alternative to the standard injector manifold confi guration, a mixing degas vessel
(MDV) may be recommended to reduce the chance of fading at the ozone return fi tting in
vinyl lined pools.
To plumb either injector manifold or MDV:
1. Locate an appropriate section of the return line (see below).
2. Observe and follow correct water fl ow direction (indicated by the arrow on the
injector manifold).
3. Connect the injector manifold to existing pipe with PVC cement.
Injector Manifold Plumbing
Heater
Filter
Ozone Generator
Injector
Manifold
Check
Valve
To Pool
Check Valve
(Required if equipment
is above water level)
From Pump
MDV Plumbing
MDV
Cable Tie Mounts
Dedicated Return
Optional
Manual Adjustment Valve
Main Return
Injector
(Flow direction
marked on
injector body)
Heater
Check
Valve
Filter
Flowmeter
(Remove after
verifying flow)
Variable Rate
Check Valve
or Bypass Valve
Check Valve
(Required if
equipment
is above
water level)
Tube/Check Valve Assembly
Destruct Cartridge
Tube
Adapter
Optional
Drain
1/4” ID
Tubing
From Pump
To Pool
To Pool
MIXING DEGAS VESSEL
www.zodiacpoolsystems.com
H0513600_REVA
Check valve, recom-
mended part: Jandy
Pro Series 180 Degree,
2″ - 2 1/2″.
Check Valve (P/N 7305)
Check valve, recom-
mended part: Jandy
Pro Series 180 Degree,
2″ - 2 1/2″.
Check Valve (P/N 7305)
MAX
MIN
Bekijk gratis de handleiding van JANDY CD70, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | JANDY |
Model | CD70 |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 1401 MB |