8.4 Water-side connection
NOTES
► For a complete overview of the system,
see §8.1.
► Connect the indoor unit to an ErP
compliant boiler.
► Open vent conversions are not suitable
for connecting to the Xtend.
► The indoor unit, outdoor unit and
existing boiler must be positioned as
close together as possible.
► The pipework distance between the
indoor unit and the boiler must be kept
as short as possible.
► The pipework must be drained down
before installation to prevent spillages
and damage to the surroundings.
► There must be a 400 μm filter installed in
the return heating line to the indoor unit,
the Intergas system filter is preered.
► Install shut-o valves between the indoor
unit and the heating circuit in order to
allow for maintenance work and other
interventions.
► Install a full flow non-return valve in the
return pipe to the boiler.
► The entire system must be equipped
with an expansion vessel. (Some boiler
models incorporate a vessel, however the
capacity should be checked against the
system volume)
► The boiler incorporates a suitable 3bar
PRV.
Installation example
Heating return
Heating flow
Bekijk gratis de handleiding van Intergas Xtend Split, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Intergas |
| Model | Xtend Split |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 11570 MB |