Hoshizaki FS-1501MLJ-C handleiding

38 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 21 van 38
21
F. Final Checklist
1. Pre-Startup
1) Is the icemaker level?
2) Is the icemaker in a site where the ambient temperature is within 45°F to 100°F (7°C to
38°C) and the water temperature within 45°F to 90°F (7°C to 32°C) all year around?
3) Is there at least 6" (15 cm) clearance at rear and sides of the icemaker for proper
air circulation and ease of maintenance and service? Is there at least 24" (61 cm)
clearance at the top of the icemaker to allow for removal of the auger?
4) Is the remote condensing unit in a site where the ambient temperature is within -4°F to
122°F (-20°C to 50°C) all year around?
5) Is there at least 24" (61 cm) clearance around the remote condensing unit for proper air
circulation and ease of maintenance and service?
6) Have the shipping carton, tape, and packing material been removed from the icemaker
and remote condensing unit?
7) Have all electrical and water connections been made? Do electrical and water
connections meet applicable national, state, and local code and regulation
requirements?
8) Has the power supply voltage been checked or tested against the nameplate rating?
Has a proper ground been installed to the icemaker?
9) Has the remote condensing unit power supply voltage been checked or tested against
the nameplate rating? Has a proper ground been installed to the remote condensing
unit?
10) Has the electrical power supply been on to the remote condensing unit for a minimum of
4 hours?
11) Are the water supply and drain lines sized as specied? Are the water supply line
shut-off valve and drain valve installed? Has the water supply pressure been checked to
ensure a minimum of 10 PSIG and a maximum of 113 PSIG?
12) Is the compressor snug on all mounting pads? Have the refrigerant lines been checked
to make sure they do not rub or touch other lines or surfaces? Has the fan blade been
checked to make sure it turns freely?
13) Is the line set free of leaks and kinks? If needed, has an "S" oil-trap been installed?
14) Continue to "II.G. Startup".

Bekijk gratis de handleiding van Hoshizaki FS-1501MLJ-C, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkHoshizaki
ModelFS-1501MLJ-C
CategorieNiet gecategoriseerd
TaalNederlands
Grootte3389 MB