Handleiding
Je bekijkt pagina 27 van 88

31-5001099 Rev. 1 27
Installation Instructions
Step 1 - Preparation (cont)
D. Procedure for selecting the location:
• Place above the ceiling where you have enough
space to position the unit.
• Place where the drainage pipe can be properly
positioned.
• Place where the inlet and outlet air of the indoor unit
will not be blocked.
• Do not install the unit in a place with heavy oil or
moisture (e.g. - kitchens and workshops)
• Do not install in a location with destructive gas (such
as sulfuric acid gas) or pungent gas (thinner and
gasoline) are used or stored.
• Choose a place solid enough to bear the weight and
vibration of the unit and where the operation noise will
not be amplified.
• Install where there are no expensive items like a
television or piano below the indoor unit.
• Leave enough space for maintenance.
• Install at least 3 ft. away from televisions and radios
to avoid interference.
NOTES:
• R454B refrigerant is a mildy flammable refrigerant.
However, if there is a concern about a dangerous
level of refrigerant concentration in the case of
refrigerant leakage, add extra ventilation.
E. Threaded Rod Mounting Information:
The Cassette unit should be mounted to the building
structure using threaded rods. The threaded rods
should have washers and nuts to allow the height and
level of the cassette to be adjusted.
The threaded rods and attachment brackets are field
supplied items. The materials required for mounting to
the brackets on the cassette assembly include:
• 4- 3/8” Threaded Rods
• 4- Mounting Brackets
• 8- Washers
• 8- Nuts (Double nut the assembly as shown)
Bekijk gratis de handleiding van Haier Endure US09CB2BEA, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Haier |
Model | Endure US09CB2BEA |
Categorie | Airco |
Taal | Nederlands |
Grootte | 18062 MB |