Floor installation systems
Inter-unit working
On today’s construction sites, inter-unit working is a matter of course and the associated inten-
sive communication with the neighbouring units essential.
For this reason, we at Hager recommend, at the beginning of the construction phase and in
agreement with the construction management, co-ordination between electricians and the con-
terminous inter-unit working, in order to guarantee a flawless procedure for installing the floor
installation system and the quality of the entire construction section.
Inter-unit working - Screed work
Screed-flush cable duct systems and the connector boxes of the screed-covered duct system
are a binding draw-off gauge for the screed. The levelling height of the system components is
aligned to the structural specifications of the construction management (observe the cutting
check).
The screed layer must work, compact and draw off the screed carefully in the area of the con-
nector boxes and cable trunking. Screed can be destroyed through crack formation. Screed-
flush systems and system components may not be subjected to loads before the screed has
finally hardened, in order to avoid crack formation in the screed.
General information for screed layers
The duct system levelled to the target screed height and the levelled floor boxes may not be
subject to a load, walked on or opened before the target screed stability is reached. With cov-
ers with snap fastenings, the transport lock screws of the cover may only be removed when
the screed has hardened. Screed-flush ducts and floor boxes must be levelled to the intended
height before screed laying (construction side height line). The screed layer should check the
levelling height. Smooth and compress screed well on the screed-flush ducts and floor boxes.
Only this achieves the required load capacity. All the duct openings larger than the grain size
used must be sealed.
Inter-unit working - Floor covering work
The company responsible for the floor covering work is also responsible for the exact routing
and adaptation of the floor covering to the connector boxes and cable outlets.
The exact joint dimensions must be clarified in advance with the construction management.
The covers of the screed-flush connector boxes must also be covered with floor covering.
Any carpet used must be permanently laid and must be resistant to cutting.
Inter-unit working - Building cleaning
In particular during the initial cleaning of the floor surfaces, building installation units and instal-
lation spaces must be carefully cleaned of construction dust and other impurities, so that their
function does not lead to impairments later.
P
During the use phase, building installation units must be checked for their intended use and
possible damage, in order to avoid later damage (Facility Management / Electricians).
P
In particular, device installation units for wet cleaned floors are to be maintained regularly
and the seals checked for their function. For this, it is necessary to relubricate the seal regu-
larly (Facility Management / Electricians).
Bekijk gratis de handleiding van Hager UKE240480, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Hager |
| Model | UKE240480 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 11902 MB |
Caratteristiche Prodotto
| Kleur van het product | Zink |
| Breedte | 240 mm |
| Diepte | 1 mm |
| Hoogte | 48 mm |
| Certificering | EN50085-2-2 |