Hager ESR2339010 handleiding
Handleiding
Je bekijkt pagina 206 van 308

204
Technical changes reserved
electraplan.VE-EE
electraplan.VE-EE
Installation instructions, service unit EKQ/EKR
General information:
The threaded pins enable stepless height levelling.
Device casing sockets can be set to a lower position using an
releasable latching bracket.
It is also possible to install a plug-in latching bracket extension.
The units are characterised by their compact designs.
Stepless
Latching
bracket
Latching
bracket
extension
Solid
Exchange the protection cover
01
Remove the protection cover immediately before
laying the floor covering, and exchange it with a
fitting frame. Use screws to attach it in the socket
frame or in the levelling frame.
Screw in the levelling set
02
The cassette frame is elevated on four levelling
sleeves with M8 threaded pins and retaining clamps.
Screw the threaded pins into the sleeves and bring
them to roughly the same height.
Set the cassette in the mounting hole
03
For mounting, the cassette is placed in the
mounting hole and roughly levelled.
Attach the cassette
04
The retaining clamps are attached to the
bare floor using knock-in anchors or screws.
Connect the protective conductorn
05
The protective conductor connection cable is to
be included in the on-site earthing measures.
Lay the floor covering
06
The floor covering should fit to the stainless
steel cassette via an expansion joint.
Bekijk gratis de handleiding van Hager ESR2339010, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Hager |
| Model | ESR2339010 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 89702 MB |
Caratteristiche Prodotto
| Kleur van het product | Wit |
| Breedte | 45 mm |
| Diepte | 40 mm |
| Duurzaamheidscertificaten | RoHS |
| Aantal | 10 |







