Floor installation systems
Information on the floor covering and for the floor layer
Information on the floor covering
When selecting the floor covering materials, it should be noted that floor installation systems
are subject to the impacts of payloads and must be classified using testing loads of 500 N up to
20,000 N, in accordance with DIN EN 500 85.
In so doing, dynamic bending of up to 6 mm and residual deformations of up to 3 mm shall not
be considered faults. Evenness dimensions for finished floors can be found in DIN 18202 Tab. 3
Line 3.
Self-carrying layer thicknesses for facing concrete, artificial resin, mastic asphalts, as well tiles
or natural stone can therefore prevent later crack formation of the covering with changing dy-
namic loads.
Even small bends can cause damage to thin, hard floor coverings, such as tiles. Thick floor cov-
erings, such as granite plates, increase the load capacity of the underfloor system, producing a
more beneficial load distribution.
Information for the floor layer
The floor covering, carpet, tiles, laminate, etc. to be laid must be installed correctly according
to VOB Part C/DIN 18352, DIN 18353 and DIN 18365. In addition, possible trip points must be
avoided using suitable measures, in accordance with the Workplaces Ordinance ArbStättV ASR
A1.5/1.2 Floors of the German Federal Institute for Occupational Safety and Health.
Preconditions for laying floor coverings
Before the floor covering can be laid, the following conditions must be fulfilled:
– Dust and dirt must be removed from the floor ducts and universal floor boxes, in order to im-
prove the adhesion of the floor coverings.
– Coverings made of wooden materials for covers must be treated on both sides, so that they
do not warp. With single-sided adhesion, use double-sided carpet tape.
– With many wooden materials, it is wise to plan for expansion joints, which compensate for
expansion and also shrinkage. These are then located, for example, along the side walls of
floor ducts and on outer frames of cassettes.
– With floor coverings, observe the course of the surface structure.
– Long-tufted floor covers can get in the way when inserting the duct covers.
Laying floor covers on BKB / BKG ducts
When laying floor coverings on BKB and BKG ducts, particular attention must be placed to
these two points:
– With hard floor coverings, such as wood or tiles, expansion joints must be planned for.
– With floor coverings that tend to fray, the edges should be sealed.
Laying floor covers on BKF(D) / BKW(D) ducts
– A covering joint cover (BKZBSA7011) should be preferred to the covering joint edge for light-
ly fraying textile floor coverings. These are available in 2.4 m lengths.
– Use the cut floor covering to lay the duct covering.
– Work hard floor coverings, such as wood or tiles, up to the inner side of the plastic profile.
– With hard floor coverings, such as wood or tiles, expansion joints must always be planned
for.
– A PVC floor covering can be welded to the covering joint edge.
Special features for cassettes with covering joint edge
– Work hard floor coverings, such as wood or tiles, up to the cassette which has already been
inserted. Always plan for an expansion unit to the supply unit.
– With hard coverings, an expansion joint should also be planned in the cover flap.
Bekijk gratis de handleiding van Hager AKB81500402, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Hager |
| Model | AKB81500402 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 11902 MB |
Caratteristiche Prodotto
| Kleur van het product | Zink |
| Breedte | 150 mm |
| Diepte | 800 mm |
| Hoogte | 40 mm |
| Materiaal | Staal |