Growatt SPH 4000-10000TL3 BH-UP handleiding
Handleiding
Je bekijkt pagina 80 van 88

10 EU Declaration of Conformity
Ÿ 2014/35/EU Low Voltage Directive (LVD)
Ÿ 2014/30/EU Electromagnetic Compatibility Directive (EMC)
Ÿ 2011/65/EU RoHS Directive and its amendment (EU)2015/863
Shenzhen Growatt New Energy Technology Co. Ltd confirms that the Growatt inverters
and accessories described in this document are in compliance with the above-mentioned
EU directives. The entire EU Declaration of Conformity can be found at
www.ginverter.com.
Within the scope of EU directives:
2. Remove the inverter from the mounting bracket.
3. Put away the mounting bracket.
1. Disconnect all electrical connections from the inverter, including the RS485
communication cable, DC input cables, AC output cables, battery cables, and the
grounding cable.
If the original package is available, please place the inverter in the original box and tie it
with tapes.
If the original package is not available, please put the inverter in a carton box that is
suitable for its dimensions and weight.
Do not dispose of the product together with the household waste but in
accordance with the disposal regulations for electronic waste applicable at the
installation site.
11.1 Removing the SPH inverter
Decommissioning 11
Be aware of the residual heat on the SPH enclosure to avoid body
burns.
Wait 20 minutes for the SPH to cool down before removing it.
11.2 Packing the SPH inverter
Store the inverter in a dry place and keep the temperature between -25℃ and 60℃
11.3 Storing the SPH inverter
11.4 Disposing of the SPH inverter
76
75
Bekijk gratis de handleiding van Growatt SPH 4000-10000TL3 BH-UP, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Growatt |
| Model | SPH 4000-10000TL3 BH-UP |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 8645 MB |







