Goodwe GW50K-SMT-L-G10 handleiding

58 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 28 van 58
06 Electrical Connection
24
User Manual V1.2-2025-01-16
6.5 Communication
6.5.1 RS485 Communication Networking
NOTICE
If multiple inverters are connected to the EzLogger3000C for networking, the maximum
number of inverters per COM port of the EzLogger3000C is 20, and the total length of the
connecting cable should not exceed 1000m.
It is recommended to use the communication cable with shielding layer, and make it
grounded during wiring.
For multiple inverters paralleling, please connect the provided terminal resistance to the
last inverter to ensure normal communication.
When all loads in the PV system cannot consume the generated electricity, the surplus power
will be fed into the grid. In this case, it is possible to monitor the power generation with an smart
meter, EzLogger3000C to control the amount of power fed into the grid.
Monitoring
Platform
Server
Inverter20Inverter2Inverter1
6.5.2 Power Export Limit
EzLogger3000C
Inverter20
Inverter2
Inverter1
Inverter20
Inverter2Inverter1
Inverter20
Inverter2Inverter1

Bekijk gratis de handleiding van Goodwe GW50K-SMT-L-G10, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkGoodwe
ModelGW50K-SMT-L-G10
CategorieNiet gecategoriseerd
TaalNederlands
Grootte6698 MB