09 Maintenance
71
No. Fault Cause Solutions
33
BUS
Overvoltage
1. The PV
voltage is too
high.
2. The sampling
of the inverter
BUS voltage is
abnormal.
3. The isolation
of the trans-
former of the
inverter is
poor, so two
inverters in-
uence each
other when
connected to
the grid. One
of the invert-
ers reports DC
Overvoltage.
Disconnect the AC output switch and
DC input switch, and after 5 minutes,
close the AC side switch and DC side
switch. Contact the dealer or the
after-sales service if the fault persists.
34
P-BUS Over-
voltage
35
N-BUS Over-
voltage
36
BUS Over-
voltage(Slave
CPU 1)
37
PBUS Over-
voltage(Slave
CPU 1)
38
NBUS Over-
voltage(Slave
CPU 1)
39
PV Input
Overvoltage
Excessive PV
modules are
connected
in the series,
and the open-
circuit voltage
is higher than
the operating
voltage.
Check whether the PV string open-
circuit voltage meets the maximum
input voltage requirements.
40
PV
Continuous
Hardware
Overcurrent
1. Improper
PV panels
conguration.
2. Hardwares
are damaged.
Disconnect the AC output switch and
DC input switch, and after 5 minutes,
close the AC side switch and DC side
switch. Contact the dealer or the
after-sales service if the fault persists.
Bekijk gratis de handleiding van Goodwe GW50K-SDT-C30, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Goodwe |
| Model | GW50K-SDT-C30 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 11037 MB |