07 Equipment Commissioning
53
Only for Australia: GW5000-SDT-AU30、GW6000-SDT-AU30、GW8000-SDT-AU30
、GW9990-SDT-AU30、GW15K-SDTAU30、GW20K-SDT-AU30、GW25K-SDT-AU30
、GW29K9-SDT-AU30、GW50K-SDT-C30.
Installing the Protecting Cover
7 Equipment Commissioning
7.1 Check Items Before Power ON
No. Checking Item
1
The inverter is rmly installed in a clean place where is well-ventilated
and easy to operate.
2
The PE cable, DC input cable, AC output cable, and communication
cable are connected correctly and securely.
3 Cable ties are routed properly and evenly, and no burrs.
4 Unused ports and terminals are sealed.
5
The voltage and frequency at the connection point meet the on-grid
requirements.
7.2 Power On
Step 1 Turn on the AC switch between the inverter and the utility grid.
Step 2 (Optional) Turn on the DC switch between the inverter and the PV
modules.
Step 3 Turn on the DC switch of the inverter.
Bekijk gratis de handleiding van Goodwe GW50K-SDT-C30, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Goodwe |
| Model | GW50K-SDT-C30 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 11037 MB |