User Manual V1.2-2025-01-1307 Equipment Commissioning
32
1
2
No. Check Item
1
The inverter is rmly installed in a clean place where is well-ventilated and easy to
operate.
2
The PE cable, DC input cable, AC output cable, and communication cable are connected
correctly and securely.
3 Cable ties are routed properly and evenly, and no burrs.
4 Unused ports and terminals are sealed.
5 The voltage and frequency at the connection point meet the on-grid requirements.
7 Equipment Commissioning
7.1 Check Items Before Switching Power ON
7.2 Power On
Step 1 Turn on the AC breaker between the inverter and the utility grid.
Step 2 Turn on the DC switch of the inverter.
AC Breaker
Transformer
Power
distribution
cabinet
PV
Grid
Inverter
DC Switch

Bekijk gratis de handleiding van Goodwe GW225K-HT, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkGoodwe
ModelGW225K-HT
CategorieNiet gecategoriseerd
TaalNederlands
Grootte5930 MB