07 Equipment Commissioning
32
User Manual V2.2-2025-07-24
7 Equipment Commissioning
7.1 Check Before Power ON
No. Check Item
1
The product is rmly installed at a clean place that is well-ventilated and easy to
operate.
2
The PE, DC input, AC output, and communication cables are connected correctly and
securely.
3 Cable ties are intact, routed properly and evenly.
4 Unused ports and terminals are sealed.
5
The voltage and frequency at the connection point meet the inverter grid connection
requirements.
7.2 Power On
Step 1 Turn on the AC switch between the inverter and the utility grid.
Step 2 Turn on the DC switch of the inverter.
AC Switch
Utility
Grid
PV String
Inverter
2
I
II (AU)
OFF
ON
OFF
ON
1
OFF
ON
OFF
ON

Bekijk gratis de handleiding van Goodwe GW10K-MS, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkGoodwe
ModelGW10K-MS
CategorieNiet gecategoriseerd
TaalNederlands
Grootte6944 MB