Gladiator GAKT48SLGY handleiding

42 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 10 van 42
10
Mount the Panels
Panels are installed with the interlock tongue up and the
groove down.
Cut the rst panel to this length, making sure the cut is square.
Be sure to also cut around any windows, doors, and outlets.
NOTE: Panels shorter than 24" (60.96 cm) long should not be
used.
Holding the panel up in the desired location, drive a screw
through the top slot groove and into the stud nearest to the
middle of the channel until it is ush with the surface.
Measure from the starting edge of the desired coverage area to
the center of the last wooden stud that is within 4 ft (1.22 m).
Take note of interference with any windows, doors, and outlets.
Place the panel above the horizontal chalk line applied in
the “Prepare the Wall” section. Align the panel with both the
starting edge and the horizontal chalk line.
NOTE: If installing an optional trim kit, be sure to apply the trim
at this time if mounting against an interior corner (see “Trim
Options” for details).
Check that the panel is level, and then drive a second screw
through the bottom slot groove and into the same stud as in
the previous step.
1. Orient the Panel
3. Cut to Length
BUBBLE LEVEL
6. Level the Panel
5. Drive First Screw
2. Measure the Panel
4. Locate the Panel

Bekijk gratis de handleiding van Gladiator GAKT48SLGY, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkGladiator
ModelGAKT48SLGY
CategorieNiet gecategoriseerd
TaalNederlands
Grootte5609 MB