Festo PDAD-100-G1/2 handleiding

42 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 20 van 42
20
Festo — PDAD — 2022-02i
Assembly
2
1
3
Fig. 9: Tubing on the condensate drain
1
Condensate input
2
Tubing
3
Condensate output
Connect condensate input and condensate output
1.
Connect tubing to the condensate drain of the micro filter (outside diameter 4 mm, included in the
scope of delivery).
2.
Connect the other end of the tubing to the adsorption dryer condensate input with fitting NPQH-L
(port Kondensat Einlass/Drain inlet at rear).
3.
Connect another tubing to the condensate drain of the adsorption dryer with the fitting NPQH-L
(connection Kondensat Ablass/Drain outlet on the back).
4.
Place the open end of the tubing in a bucket.
5.
Fasten the tubing to the drain point to prevent the tubing from whipping during the drainage
process.
5.3 Installing mounting accessories
The mounting accessories are not included in the scope of delivery of the adsorption dryer PDAD.
Wall mounting ABMW-PDAD Foot mounting ABMF-PDAD
Tightening torque: max. 10 Nm Tightening torque: max. 10 Nm
Tab. 11: Mounting options

Bekijk gratis de handleiding van Festo PDAD-100-G1/2, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkFesto
ModelPDAD-100-G1/2
CategorieNiet gecategoriseerd
TaalNederlands
Grootte4080 MB