Festo EPCS-BS-60-400-5P-A-ST-M-H1-PLK-AA handleiding

28 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 10 van 28
10
Festo — EPCS-BS — 2023-11e
Commissioning
1
3
4
5
2
Fig. 6: Wiring diagram: IO-Link operation via adapter NEFC
1
PELV fixed power supply for the load
voltage supply
2
PELV fixed power supply for the logic power
supply
3
Integrated drive EMCS-ST
4
IO-Link master with IO-Link interface
5
Adapter NEFC
Core colours of Festo cables:
BK=black, BN=brown, BU=blue, GN=green, GY=grey, PK=pink, WH=white, YE=yellow
9
Commissioning
WARNING
Risk of injury due to unexpected movement of components.
Protect the positioning range from unwanted intervention.
Keep foreign objects out of the positioning range.
Perform commissioning with low dynamic response.
WARNING
Severe, irreversible injuries from accidental movements of the connected actuator technology.
Unintentional movements of the connected actuator technology can result from exchanging the con-
necting cables of a servo drive or between servo drives.
Before commissioning: All cables must be correctly assigned and connected.

Bekijk gratis de handleiding van Festo EPCS-BS-60-400-5P-A-ST-M-H1-PLK-AA, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkFesto
ModelEPCS-BS-60-400-5P-A-ST-M-H1-PLK-AA
CategorieNiet gecategoriseerd
TaalNederlands
Grootte2484 MB