Extron IPL EXP S5 handleiding

49 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 38 van 49
IPL EXP I/O Series • Software-based Configuration and Control 30
Basic Setup Steps: a Guide to this Section and Other Resources
NOTE: GC projects can be created offline and uploaded to the hardware at a later date.
Follow the steps in Setup Checklist starting on page 6. The overall process for setting up a control processor
using GC is as follows:
Configure the IP settings
of the control processor,
expansion interface,
NBP network button panels, and
TouchLink Pro touchpanels.
See Network
Communication Setup
Create monitors, schedules, timers,
macros, and local variables.
Add IPL EXP expansion interfaces, touchpanels, other
interfaces, or button panels (if used) to the project.
Import GUI layouts and congure the
touchpanels or other interfaces.
Test the system, make adjustments,
nalize conguration.
Save the project.
Build and upload the conguration to
the control processor.
If desired or required, use
Toolbelt or other software to congure
security settings for 802.1X, SSL.
Upload security certicates, private keys.
Create a new GC Professional or GC Plus project
and add the control processor to it.
Within Global Configurator
(GC Professional or
GC Plus mode):
Use GUI Designer to create
and save GUI layout designs
as needed.
Or...
Download existing
GUI layouts from identical
touchpanels.
Congure ports on the
control processor.
Is
a GUI layout
required?
No Yes
Figure 16. Overall Configuration Steps
16
Network
Communication Setup
on page 9.

Bekijk gratis de handleiding van Extron IPL EXP S5, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkExtron
ModelIPL EXP S5
CategorieNiet gecategoriseerd
TaalNederlands
Grootte7534 MB