Everpure QC7I Twin 4FC handleiding

8 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 5 van 8
SYSTEM OPERATION
With adequate pressure, normal operation of the system is completely automatic. Dependable operation involves only monitoring of
the outlet pressure, periodic lter changes and service documentation. Filter changes are necessary for optimum performance of your
foodservice equipment.
Pressure Gauge Monitoring
Periodically monitor the pressure gauge on the system. When connected equipment is not using water (no water owing through the
ltration system) the pressure on the gauge indicates the static ”available water pressure“ supplied to the system. When connected
equipment is in operation and water is owing through the system, the outlet pressure gauge indicates the dynamic”service water pressure“.
The service water pressure may become lower as sediment accumulates in the lter cartridge(s) restricting ow. If ”service water pressure
is observed to be below the “available water pressure” and gets near or enters the red zone, it is an indication that the lters are becoming
clogged and should be replaced. Monitoring the service water pressure can help ensure that pressure loss through the lter is not
interfering with normal equipment operation.
MAINTENANCE
The only routine maintenance your Pentair Everpure system should ever require is periodic lter cartridge changes. Filter changes are
necessary for optimum performance of your foodservice equipment.
Contact your Pentair Everpure dealer for replacement cartridges and system replacement parts.
The Pentair Total Water Management (TWM) program offers end-to-end water treatment services that include:
Water Analysis
Site Surveys
Product Solutions
Installation and Start-Up
Planned Maintenance
To learn more about how Pentair Total Water Management can help support your business, contact your Pentair Everpure dealer or
TWMProject Management at (800) 842-6193 or TWM@Pentair.com.
FILTER CHANGE DETERMINATION
It is recommended that all lter cartridges be replaced:
Every six (6) months on a regular scheduled program
All primary quick-change cartridges on multiple cartridge systems must be changed at the same time.
When water pressure or ow to equipment becomes inadequate.
This may be due to excessive sediment accumulating in the lter cartridge(s) causing ow restriction. If this occurs and the ltration
system includes a prelter, replace the prelter cartridge rst. If the water pressure and ow to equipment is not corrected, replace the
primary quick-change (QC) lter cartridge(s).
Always replace lter cartridges at least once per year.
All primary quick-change cartridges on multiple cartridge systems must be changed at the same time.
PENTAIR® EVERPURE® FC SERIES WATER FILTRATION SYSTEMS INSTALLATION, OPERATION & MAINTENANCE GUIDE • 5

Bekijk gratis de handleiding van Everpure QC7I Twin 4FC, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkEverpure
ModelQC7I Twin 4FC
CategorieNiet gecategoriseerd
TaalNederlands
Grootte1208 MB