Everpure EZ-RO 650 handleiding
Handleiding
Je bekijkt pagina 19 van 28

PENTAIR EZ-RO INSTALLATION AND OPERATION GUIDE FOODSERVICE.PENTAIR.COM | 19
FILTER CHANGE AND FLUSHING PROCEDURE (CONTINUED)
FLUSH PREFILTER AND MINERAL CARTRIDGES
8. Turn reject ush valve to open position
(pointing down).
9. Close the permeate sample port valve (pointing left).
10. On the TO TANK LINE – Run Tee sample line into
bucket or drain. Open tee sample port. Water will
ush out of this line.
11. Turn inlet valve to open position.
• Water will start to ll prelter and mineral
cartridges. Water will run from reject/sample port
and tank sampling valve.
• The solenoid valve needs to remain open; a
permeate ow test may be required again if the
ATM system status light is green. See image 4.
12. Flush prelter and mineral addition for ve minutes
or until water runs clear.
RETURN EXISTING RO MEMBRANE OR REPLACE
WITH NEW RO MEMBRANE (IF REQUIRED)
13. Turn processor inlet valve to closed position.
(horizontal).
14. The pressure gauge will reduce to 0 psi.
15. Remove membrane bypass plug (turn 90 degrees,
left and pull down). Store under cover.
16. Insert RO membrane into the farthest right position
(insert and turn 90 degrees to right).
17. Turn inlet valve to open position (vertical).
• Water will start to ush through membrane.
Water will run from reject and TO TANK line
sample port when solenoid valve is still open.
IF REUSING EXISTING MEMBRANE, SKIP TO STEP 22
9
permeate permeate
sample sample
port port
valvevalve
8
reject
ush
valve
13
14
16
15
remove remove
plugplug
FILTER CHANGE
17
10
tank tank
sampling sampling
valve valve
(open)(open)
11
12
Bekijk gratis de handleiding van Everpure EZ-RO 650, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Everpure |
| Model | EZ-RO 650 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 13630 MB |




