Everpure EZ-RO 650 handleiding
Handleiding
Je bekijkt pagina 14 van 28

14 | PENTAIR EZ-RO INSTALLATION AND OPERATION GUIDE FOODSERVICE.PENTAIR.COM
TWENTY-FOUR HOUR MEMBRANE FLUSH
1. Make sure system pressure is down to 0 psi.
2. Remove the membrane plug. Rotate left and pull
down.
3. Store plug under system cover for future use.
4. Install supplied RO membrane cartridge (EZ-375 or
EZ-650) into the farthest right position.
5. Turn on incoming feed water from source.
• Water will begin to ll the RO processor.
• Water will start to run from reject outlet at full
ush and TO TANK port tubing.
• Ensure both lines are secure with water owing
to drain or sink.
6. Flush the system through reject outlet and TO TANK
port for one hour.
7. After one hour close the reject ush valve.
It's the side middle blue handle.
Closed = pointing left.
At this time, turn blending valve fully closed by
rotating knob clockwise until it stops.
8. Continue to ush for another 23 hours.
9. Recommended: Using a graduated cylinder, record
the optimized water ow and reject ow in ounces/
minute or milliliters/minute.
Fill the graduated cylinder for one minute for each.
Record the values here:
Optimized water_________________oz. or ml_____ /min
Reject water_____________________oz. or ml_____ /min
NOTE: Reject water volume in one minute will probably
exceed 32 oz./1,000 ml. Use a large container or collect
samples in multiple containers and add all of
the collected volumes together.
1
2
remove remove
plug plug
3 4
membrane membrane
cartridge incartridge in
6
7
blending
valve
reject
ush
valve
8
23
HOURS
9
FLUSH
5
Bekijk gratis de handleiding van Everpure EZ-RO 650, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Everpure |
| Model | EZ-RO 650 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 13630 MB |




